13 April 2002 – The Open Forum

An Open Forum was held on 13 April 2002 (details see www.fsica.org.hk ), it started at 9:30 am and finished at 1:00 pm.

There were 85 participants from 39 Registered Fire Service Installation Contractors attending the Forum.

The members of Working Group of the FSICA on the Review of Fire Service Installation Contractors Registration (WGFSICR) – Peter Lam, Wicky Lo, WS Lee and Raymond Tsui took the participants through the Working Report – 2nd Stage Review (Draft) (see Presentation of the 2nd Report (R1).ppt ).

Seventeen (17) comments were collected from the forum.

 

Working Report – 2nd Stage Review (DRAFT) March 2002

The Schedule Of Events For Review Of Fire Service Installation Contractors Registration Scheme Working Report Introduction (342.2 KiB)

The Schedule Of Events For Review Of Fire Service Installation Contractors Registration Scheme Matters Arising From The First Stage Of The Review (1.9 MiB)

The Schedule Of Events For Review Of Fire Service Installation Contractors Registration Scheme Transitional Arrangement To The New Classification Scheme (1.4 MiB)

The Schedule Of Events For Review Of Fire Service Installation Contractors Registration Scheme Renewal Of Registration (673.5 KiB)

The Schedule Of Events For Review Of Fire Service Installation Contractors Registration Scheme Legislative Amendments To The Existing Fire Service Regulation (6.4 MiB)

The Schedule Of Events For Review Of Fire Service Installation Contractors Registration Scheme Manpower Resources To Implement The New Scheme And Request Comments From Members (288.2 KiB)

The Schedule Of Events For Review Of Fire Service Installation Contractors Registration Scheme Appendix I - Recommended Classification Of FSIC (627.1 KiB)

The Schedule Of Events For Review Of Fire Service Installation Contractors Registration Scheme Appendix II - Recommended Qualification Of FSIC (896.9 KiB)

The Schedule Of Events For Review Of Fire Service Installation Contractors Registration Scheme Appendix III - Extract Of Code Of Practice On Minimum Fire Service Installations And Equipment (602.7 KiB)

The Schedule Of Events For Review Of Fire Service Installation Contractors Registration Scheme Appendix IV - Fire Service (Installation Contractors) Regulations (6.1 MiB)

The Schedule Of Events For Review Of Fire Service Installation Contractors Registration Scheme Appendix V - Fire Service (Installations And Equipment) Regulations (2.2 MiB)

The Schedule Of Events For Review Of Fire Service Installation Contractors Registration Scheme Appendix VI - Proposed Increase Of Fines (404.1 KiB)

 

17 April 2002 – The Draft Reply based on the comments collected

It is scheduled that on 17 April 2002 the members of Working Group of the FSICA on the Review of Fire Service Installation Contractors Registration (WGFSICR) shall complete a Draft Reply for sending to HKFSD based on the comments collected from the Forum.
19 April 2002 – FSICA Council to review the Draft Reply 

The Council members of FSICA shall review the Draft Reply produced by the WGFSICR on 19 April 2002, amendments according to the comments from Council Members shall be incorporated in the Draft Reply before it has been distributed to the participants who attended the Forum held on 13 April 2002.
22 April 2002 – Distribution of the Draft Reply

The Draft Reply shall be distributed to the participants who attended the Forum held on 13 April 2002.
30 April 2002 – Deadline of comment 

The deadline for collection of comments from the members of FSICA for the Working Report – 2nd Stage Review (Draft) to HKFSD.
2 May 2002 – WGFSICR meeting for the comments received from members

The members of WGFSICR shall meet to discuss and review the comments received from FSICA members (and comments non-FSICA members may be adopted also) and prepare a Final Draft Reply for Working Report – 2nd Stage Review (Draft) to HKFSD.
10 May 2002 – FSICA Council to endorse the Final Draft Reply for the Working Report – 2nd Stage Review (Draft)

The Council of FSICA shall review and endorse the Final Draft Reply for the Working Report – 2nd Stage Review (Draft).
11 May 2002 – Distribution of the Final Draft Reply

After the endorsement of FSICA Council, all Registered Fire Service Installation Contractors (both members and non-members of FSICA) shall receive a copy of Final Draft Reply, which will be sent by FSICA on 11 May 2002, for final review.
18 May 2002 – Reply to HKFSD

If there are no major comments received from the members of FSICA, The Final Draft Reply shall be sent to HKFSD on 18 May 2002.
Please forward your comments on the Working Report – 2nd Stage Review (Draft) to:

Attention: WS Lee, Hon. Secretary of FSICA
Fax no.: 2191 7853
E-mail: fsica@netvigator.com
Before 30 April 2002